Large scale tree plantation in and around the mining
areas
The success in land reclamation of mines spoils and
afforestation has been very significant and
overwhelming in places like Ashoka, Piparwar etc.
The mined out areas or the de-coaled area is
refilled with overburden at places where no mining
is required in future. The OB fills and dumps are
not very conducive to growth of plants, since these
sites do not contain adequate plant nutrients. The
dumped soil is improved in stages through modern
techniques to bring back its fertility and the
horticultural operations are carried out by adding
nutrients, like organic, inorganic and
biofertilizers.
The total plantation done in CCL
since 1992 is more than 75 lakhs, covering about
4740 Ha in all the mining areas of CCL. During last
10 years the plantation done is more than 37 lakhs
which itself is a positive indication of improvement
in bio-diversity and environment. It has also helped
in Sequestration of carbon in terrestrial eco
system.
Plantation in CCL during last 10 years |
Year |
Plantation (No of Trees planted in lakhs) |
2004 |
6.03 |
2005 |
4.76 |
2006 |
5.16 |
2007 |
6.09 |
2008 |
5.45 |
2009 |
0.375 |
2010 |
1.000 |
2011 |
4.058 |
2012 |
3.028 |
2013 |
1.573 |
Total |
37.555 |



Plantation on Backfilled area of Piparwar OCP of CCL

Migratory bird finding shelter at Piparwar OCP
►
Reclamation of
Mined out Areas.
Bio-reclamation of degraded mined areas of more than
4680 Ha (since 1992) of different types of land like
OB dumps, subsided areas, mined out areas, colonies,
avenues etc.
Remote Sensing Survey for analysis for land use
improvement in large mines.
The large producing mines are being monitored for
land reclamation by Remote Sensing techniques
through CMPDI on annual basis. The mines being
monitored are Ashok OCP, Piparwar OCP, KDH OCP,
Parej east OCP, Rajrappa OCP, Rohini OCP, Purnadih
OCP, Tapin OCP, Jharkhand OCP, Topa OCP, Urimari OCP,
North Urimari OCP, New Giddi-C OCP, Govindpur PH-II
OCP, Khasmahal OCP, Amlo OCP, Selected Dhori OCP,
Tarmi OC. The remote sensing study have been started
for North Karnpura and South Karnpura Coalfields.

MAP
SHOWING THE REMOTE SENSING IMAGERY OF PIPARWAR OCP
2006

MAP
SHOWING THE REMOTE SENSING IMAGERY OF PIPARWAR OCP
2008

MAP
SHOWING THE REMOTE SENSING IMAGERY OF PIPARWAR OCP
2010

MAP
SHOWING THE REMOTE SENSING IMAGERY OF PIPARWAR OCP
2011
Management of Air
Quality
All
the mines / washeries of CCL are being monitored on
regular basis by CMPDI. Every quarter there are
about 200 Ambient Air Quality sampling, 220 water
quality sampling and 140 noise survey being done by
CMPDI. In case of any, adverse parameters reported
immediate action is taken by the areas / projects
for amelioration. The different mitigative measures
adopted are
Dust Control in Opencast Mines
►
Provision for water
sprinkling by 28 KL tankers In all its Open cast
mines haul roads and others
The total no of mobile water sprinklers in CCL
are 44 of capacity 28KL each and two 60 KL each.
Besides these there are 4 converted water sprinklers
of 28 KL. In addition to these the projects are
enhancing the water sprinkling through engagement of
contractual water tankers. 17 nos. of new water
sprinklers are being commissioned. 5 more no. of
water sprinkler are likely to be added in 2014-15.

►
Avenue & Multi species plantation in and around
industrial infrastructure, roads , colony and
reclaimed area.
► Provision of domestic LPG cylinder to
employees.
► Use of personnel protective devices like
dust mask, ear plug etc.
► Provision of dust extractors
and wet drilling in all mines / units.
CCL is
having a total of 106 drill machines wherein the NVE
dust extractors are fitted in all the machines and
are working. In order to improve the environment
further CCL has made provision of wet drilling in
most of the drill machines. New drills are being
procured with wet drilling arrangement.
► Suitable
type of nozzle, water spray systems have been
installed in CHPs, Feeder breakers, Coal transfer
points, crushers etc. of mines and Washeries.
► Controlled blasting / planning of colonies
/ habitation away from the mines as far as possible.
CCL is using NONEL type detonators for controlled
blasting and minimum impact of dust and vibration.
► Modern technologies adopted
like Surface Miners
which
are generating lesser air borne pollution for
carrying out mining activities as compared to
conventional methods. Surface miners have
eliminated the need of drilling, blasting and
crushing of coal. Surface miners are in use at
Ashoka OCP and Piparwar OCP.

Eco-friendly Mining by
Surface Miner at Ashok OCP
Management of Water
Quality
► Provision
of closed water recirculation arrangement in all
washeries.
The closed water recirculation system has
stopped the effluent discharge from the washeries.
Besides this arrangements of water sprinkling in
coal transfer points, good housekeeping and
plantation etc is being done in the washeries for
overall improvement.
► Pollution
control through effluent treatment plants / domestic
treatment plants / oil grease traps etc.
There are 18 mines having ETPs (Oil & Grease Traps)
and 3 mines are having Sewage Treatment Plants.

STP at
KDH OCP of CCL – A view
►
Rain
Water Harvesting at 7 units
There are Seven units equipped with Rain Water
Harvesting (RWH) facilities.

Rain Water Harvesting at Piparwar OCP of CCL

Rain Water
Harvesting at Piparwar OCP of CCL
►
Water Treatment Plants in areas for providing
clean drinking water.
CCL is having a total of 12 water treatment
plants spread over the mining area. There are 77
pressure filters plants and 75 deep bore holes for
clean supply of domest.
►
Development of Water
bodies / lagoons in mining areas for sedimentation
of fines as well for improvement of aquatic life.

Lagoon at Piparwar OCP
of CCL
Statutory
Clearances
CCL
has obtained Environmental Clearance for 43 units as
per details given below :
Name of Projects |
Nominal |
Peak
|
Clearnce no.
|
Date |
Argada Area |
|
|
|
New
Gidi C OCP |
0.600 |
0.600 |
J-11015/34/2007-IA.II(M) |
08.11.2007 |
Barka-Sayal Area |
|
|
|
Saunda D OCP & UGP |
0.800 |
0.800 |
J-11015/17/92-IA.II(M) |
23.12.1993 |
North Urimari OCP |
3.000 |
3.000 |
J-11015/307/2005-IA.II(M) |
08.02.2006 |
Urimari Expn. |
2.000 |
2.500 |
J-11015/369/2007-IA.IIM |
16.2.2011 |
B&K Area |
|
|
|
Konar OCP |
3.500 |
3.500 |
J-11015/337/2005-IA.II(M) |
02.02.2006 |
Khasmahal OCP |
0.600 |
1.500 |
J-11015/217/2007-IA.IIM |
02.08.2010 |
Dhori Area |
|
|
|
Selected Dhori OCP |
2.250 |
2.250 |
J-11015/4/89-IA.II |
24.01.1992 |
Tarmi OCP |
1.000 |
1.000 |
J-11015/219/2007-IA.IIM |
20.04.2010 |
Amlo
OCP |
2.500 |
3.000 |
J-11015/35/2007-IA.IIM |
30.09.2010 |
Dhori OCP |
0.600 |
0.690 |
J-11015/508/2008-IA.IIM |
03.05.2012 |
New
Selected Dhori UGP |
0.080 |
0.092 |
J-11015/508/2008-IA.IIM |
03.05.2012 |
Dhori Khas UGP |
0.166 |
0.190 |
J-11015/508/2008-IA.IIM |
03.05.2012 |
Kathara Area |
|
|
|
Kathara CPP 2 x 10 MW CCL |
|
|
25/1/85-ENV.2 |
12.12.1985 |
Govindpur Ph-II |
1.200 |
1.500 |
J-11015/490/2007-IA.IIM |
18.01.2011 |
Jarangdih UG |
0.280 |
0.280 |
J-11015/502/2008-IA.IIM |
01.03.2012 |
Jarangdih OCP |
0.880 |
0.880 |
J-11015/502/2008-IA.IIM |
01.03.2012 |
Kathara |
0.960 |
1.900 |
J-11015/482/2008-IA.IIM |
08.01.2014 |
Hazaribagh Area |
|
|
|
Parej East OCP |
1.750 |
1.750 |
J-11015/36/89-IA-II(M) |
23.11.1992 |
Kedla washery project |
2.600 |
2.600 |
J-11015/33/89-IA-II(M) |
17.05.1993 |
Jharkhand OCP |
1.000 |
1.000 |
J-11015/12/89-IA.II(M) |
30.01.1995 |
Tapin OCP |
2.500 |
2.800 |
J-11015/126/2007-IA.IIM |
05.10.2009 |
Kuju Area |
|
|
|
Topa
RO |
1.200 |
1.200 |
J-11015/632/2007-IA.II(M) |
31.07.2008 |
Kuju
UG |
0.172 |
0.172 |
J-11015/219/2007-IA.IIM |
22.01.2010 |
Karma |
1.000 |
1.000 |
J-11015/225/2007-IA.IIM |
22.10.2010 |
Ara
OCP |
0.760 |
0.870 |
J-11015/536/2008-IA.IIM |
25.02.2013 |
Sarubera /Chainpur OCP |
0.500 |
0.580 |
J-11015/536/2008-IA.IIM |
25.02.2013 |
Sarubera UG |
0.180 |
0.210 |
J-11015/536/2008-IA.IIM |
25.02.2013 |
Magadh Amrapali Area |
|
|
|
Amarapali OCP |
12.000 |
12.000 |
J-11015/109/2003-IA.II(M) |
01.03.2006 |
Magadh OCP Expansion |
20.000 |
20.000 |
J-11015/865/2007-IA.II(M) |
27.10.2008 |
NK Area |
|
|
|
KD
Heslong OCP |
4.500 |
4.500 |
J-11015/35/84-IA-II(M) |
27.10.1993 |
Purnadih OCP |
3.000 |
3.450 |
J-11015/36/2007-IA.II(M) |
19.05.2009 |
Rohini OCP |
2.000 |
2.300 |
J-11015/227/2007-IA.II(M) |
05.10.2009 |
Churi benti UG |
0.810 |
0.810 |
J-11015/1005/2007-IA.IIM |
25.02.2012 |
Dakra OCP |
0.550 |
0.630 |
J-11015/49/2009-IA.IIM |
03.05.2012 |
Piparwar Area |
|
|
|
Piparwar OCP(washery/CPP) |
6.500 |
6.500 |
J-11015/12/85-IA.II(M) |
29.10.1993 |
Piparwar Expansion OCP |
10.000 |
11.500 |
J-11015/186/2007-IA.II(M) |
11.06.2007 |
Piparwar Peak |
10.000 |
11.500 |
J-11015/240/2011-IA.IIM |
25.02.2012 |
Ashok OCP Expansion(6.5 MTPA to 10 MTPA) |
10.000 |
10.000 |
J-11015/610/2007-IA.II(M) |
17.4.2008 |
Integrated Ashok Washery cum FBC |
10.000 |
10.000 |
J-11015/121/2007-IA.IIM |
03.05.2012 |
Ray
Bachra |
0.300 |
0.300 |
J-11015/490/2007-IA.IIM |
15.02.2013 |
Rajhara Area |
|
|
|
Tetariakhar OCP |
2.000 |
2.500 |
J-11015/318/2009-IA.IIM |
07.05.2013 |
Rajrappa Area |
|
|
|
Rajrappa washery Project |
3.000 |
3.000 |
J-11015/4/85-IA |
30.01.1987 |
Rajrappa OCP |
3.000 |
3.000 |
J-11015/10/88-IA.II(M) |
23.10.1992 |
Generation of
Energy
from Coal Beneficiation wastes
3 nos. of
power plants using FBC technology are operating in
CCL. These units are utilizing washery rejects
having more than 50% ash content, which would have
been otherwise a source of degradation of land and
pollution of surface water stream. The units are :
►
Kathara 2 x 10 MW
►
Rajrappa 1 x 10 MW
►
Gidi 1 x 10 MW
Similar
units are proposed at Integrated Ashok Washery cum
FBC (2 x 30 MW), Dhori Washery & Pundi washery.
Voluntary
Initiatives
►
ISO
14001 Certification : 14 Mines, a washery and a
Central Hospital have been certified as per ISO
14001 – 2004 : Environmental Management System.
These units are :
Piparwar OCP |
Birsa OCP /North Urimari OCP |
Ashok OCP |
Urimari OCP |
KDH OCP |
Topa OCP |
Rohini OCP |
Amlo OCP |
Khasmahal OCP |
Kalyani OCP |
Parej East OCP |
Rajrappa
OCP |
Jharkhand OCP |
CHP/CPP Piparwar |
Tapin OCP |
CH Naisarai Hospital |
►
Filling of
abandoned mine voids by fly ash and reclamation
thereafter
CCL has
undertaken filling of some of its abandoned mine
voids by fly ash from BTPS, CTPS, BPSCL, DLF
etc..The filled up voids are subsequently afforested
with native & multi species plants.

Fly Ash filling at
Bokaro OCP of CCL
.
►
Development of Eco-Parks :
An Eco park is
being developed at Piparwar OCP to spread awareness
about local flora and importance of harmonious
living with mother nature. Such parks will be
developed gradually in other areas also

►
Spreading Environmental
awareness. The message of conservation of
environment and resources are spread within and out
side company by following programmes :
► Celebration of World Environment Day by
all areas of CCL where in painting slogan, essay
competition etc. of school children is organized.
► Celebration of Environment Conservation
week in all areas of CCL.
► Training and seminars on Environment and
Sustainable development.
►
Eco-restoration at Sangam OCP of Barka Sayal
Area:
an experimental project to scientifically
reclaim old mined out areas using grass, Bamboo and
other species has been under taken in association
with Dr C R Babu, member EAV, MoEF.
 |