Untitled Document
     View>>> Advertisements| Notifications| Corrigendums| Cancellations| General Notifications| Status Bulletin                 

e-Tender Open (Manual) Turnkey Tender Limited Tender Enquiry Expression of Interest Request for Proposal Request for Qualification Quotation Notice Short Tender

Area Reference No. Tender Title Sale Open Sale Close Tender Opening Uploaded On
RAJHARA GM(RA)/SO(E&M)/RA/BID Notice/2019-20/05 Complete repairing of 03 nos. Air conditioner installed in weighbridge at Tetariakhar ocp Rajhara A 27- 06-2019 29- 06-2019
16: 00   
02- 07-2019
12: 30   
27-06-2019
RAJHARA GM(RA)/SO(E&M)/RA/BID Notice/2019-20/ 04 Erection of 220 volt OH lighting line from pit office to coal stock No. 5& 5A at TTK OCP under Raja 27- 06-2019 29- 06-2019
16: 00   
02- 07-2019
12: 30   
27-06-2019
RAJHARA GM(RA)/SO(E&M)/RA/BID Notice/2019-20/ 03 Laying and fixing of 200 mtr long delivery pipe range (Size 6” dia) purpose of spontaneous heating i 27- 06-2019 29- 06-2019
16: 00   
02- 07-2019
12: 30   
27-06-2019
KATHARA KTC/PE/E&M/LP/Tender/19-20/14 1.For day to day maintenance 9.0. River side filter plant and colony maintenance at Kathara Colliery. 1. Copper Lugs 185 mm 2. - do- 95 mm 3. %u2013 do %u2013 150 mm 4. %u2013 do %u2013 240 mm 5. Aluminum Lugs 300 mm 6. %u2013 do %u2013 240 mm 7. %u2013 do %u2013 185 mm 8. %u2013 do %u2013 95 mm

2.Procurement of spares for urgently required for repair of 500 GPM, 300 Mtr. head, 9CHR pump Make- Mother & Platt installed at Damodar River for Jhirkey Basti Water Supply under Kathara Colliery. 1. Neck Ring (Copper) 2. Neck Bush (Copper) 3. Long Sleeve (Copper) 4. Short Sleeve (Copper) 5. Bush (Copper)

3.Supply of flange 6%u201D, 4%u201D, 3%u201D and Bend 6%u201D, 4%u201D, 3%u201D of intake pump house and filter plant of water supply under Kathara Colliery

4.Day to day maintenance 9.0. Filter side filter plant and colony maintenance at Kathara Colliery

28- 06-2019 03- 07-2019
12: 00   
05- 07-2019
16: 00   
27-06-2019
KATHARA KTC/PE/E&M/Tender/19-20/13 Providing and fitting/fixing of Led street light fittings 48 watt x 220Volt, at different location/colonies such as colony no. 4, DAV teacher%u2019s colony, Hospital colony and Office colony of Kathara Colliery.

Repairing of 100 KVA Power Transformer, 3.3KV/415Volt of Kathara Colliery OCP

Online filtration/Dehydration of different transformer installed at different location in side Kathara Colliery

Repairing and modification of base plate of DST pump coupled with 180 HP/550Volt induction motor at intake pump house at Kathara Colliery

28- 06-2019 03- 07-2019
12: 00   
05- 07-2019
16: 00   
27-06-2019
KATHARA GM(KTA)/SO(E&M)(W)/Tender/19-20/102 Dismantling of old HPSV light fitting 250W and assembling after replacement of spares of HPSV light 04- 07-2019 10- 07-2019
17: 00   
15- 07-2019
16: 00   
27-06-2019
KATHARA P.O. (KTW) / Sr. Manager (CP) /Tender /19-20/ 55 Repairing of (02 Nos) delta pump chemical house and Kathara 4 no. booster pump at KTW

Repairing /overhauling of polish vibrator for screen unit no. 303 and 310 in Hy. Cy. Section at KTW

Repairing / making of end cover bearing housing (02 nos.) of magnetic separator unit no. 333 of Hy. Cy. Section at KTW

Repairing of body (lower & upper) and rotating assembly of DSM-6 pump installed at River side of KTW

Repairing of 02 Nos. gear box of magnetic separator unit no. 337 & 338 at Hy. Cy Section at KTW

Repairing / new making of rotor shaft for 11 KW induction motor as it has been complete by worn out during running position at KTW

Repairing with replacement of damaged stud bushing, cork gasket of 500 KVA, 11 KV / 415 Volt, oil cooled transformer at Bandh colony MQ type side at KTW

Repairing/rewinding of welding transformer 03 phase, 300Amps, 28 KVA, Make-in dark RLB 9 Mtr level of KTW at KTW

28- 06-2019 03- 07-2019
15: 00   
04- 07-2019
11: 30   
27-06-2019
KATHARA P.O. (KTW) / Asst. Manager (E&M) /Tender /19-20/ 57 Repairing of head drum and tail drum for conveyor belt no. 492 in fine coal section at KTW

Repairing and overhauling of 361-T vertical pump of sec-II and stand by of fine coal Section at KTW

Repairing of 02 nos. Audco valve size 250mm dia for suction line in the fine coal Section at KTW

Repairing and overhauling of (8 gay Pump) centrifugal pump of unit no. 652 and 361-T vertical pump of Sec-I in fine coal Section at KTW

Repairing of worm shaft, vertical shaft, housing and couplings of redial thickener no. I of fine coal Section at KTW

28- 06-2019 03- 07-2019
15: 00   
04- 07-2019
11: 30   
26-06-2019
KATHARA SGW/PO/KTA/E&M/Tender/19-20/05 Repairing of head drum, tail drum, snub drum for 52 BC etc in Main Washing Plant of Sawang Washery

Repair and maintenance of 30 mtr. thickener returning pipeline in Main Washing Plant at Sawang Washery

Repairing replacement & fitting of hub oil seal, hub check out, Dala Jack controller setting for wheel hub greasing, diesel fitter mobile fitter, separator glassing, air cleaner fitter of water truck at Sawang Washery

Repairing of vulcan gear box for secondary crusher in main washing plant under Sawang Washery

Repairing of pulley for rupu pump and impact bar crusher pulley in Deshaling Plant at Sawang Washery

Repairing of vibro feeder counter weight of road side in Main Washing Plant at Sawang Washery

Repairing of bearing housing & counter weight of USL Screens of oversize restriction & Deshaling Plant in Sawang Washery

28- 06-2019 05- 07-2019
17: 00   
06- 07-2019
11: 30   
26-06-2019
KUJU GM(K)/SO (E&M)/Topa/T.N/19-20/144 Erection of 4 wire, 440V OH lie to supply 3 phase power to 10HP submersible pump installed at Worksh 27- 06-2019 05- 07-2019
17: 00   
06- 07-2019
11: 00   
26-06-2019
KUJU GM(K)/SO (E&M)/Karma/T.N/19-20/143 Rewinding of 500KVA, 11KV/440V sl no PEE 787 lighting transformer of Karma Project under Kuju Area 27- 06-2019 05- 07-2019
17: 00   
06- 07-2019
11: 00   
26-06-2019
KUJU GM(K)/SO (E&M)/Topa/T.N/19-20/141 Repairing of 2nos , 3.3KV,400A, VCB, Prabhu make and 3.3KV, 400A ACB TMG make of Topa Project under 27- 06-2019 05- 07-2019
17: 00   
06- 07-2019
11: 00   
26-06-2019
KUJU GM(K)/SO (E&M)/Topa/T.N/19-20/140 Rewinding of 250KVA, 3.3KV/440-550V True Volt make transformer of Topa Project 27- 06-2019 05- 07-2019
17: 00   
06- 07-2019
11: 00   
26-06-2019
KUJU GM(K)/SO (E&M)/Karma/T.N/19-20/142 Repairing of 3.3KV ACB 400A of Karma OCP under Kuju Area 27- 06-2019 05- 07-2019
17: 00   
06- 07-2019
11: 00   
26-06-2019
DHORI GM(D)/SO(X)/Tender/19-20/125 Tender no.-02 of 2019-20 27- 06-2019 29- 06-2019
13: 00   
01- 07-2019
16: 30   
26-06-2019
BARKA SAYAL SO(E&M)/B-S/tender/Erection-04 LT Trfr /BHK/19-20/1620 Erection-04 L.T Trfr 29- 06-2019 03- 07-2019
17: 00   
05- 07-2019
11: 00   
26-06-2019
BARKA SAYAL SO(E&M)/B-S/tender/Repair- 11KVA OCB /Urimari/19-20/1624 Repair- 11KVA OCB Swicth 29- 06-2019 03- 07-2019
17: 00   
05- 07-2019
11: 15   
26-06-2019
BARKA SAYAL SO(E&M)/B-S/tender/Repair- 120HP Motor/Sayal-D/19-20/1623 Repair- 125HP motor 29- 06-2019 03- 07-2019
17: 00   
05- 07-2019
11: 30   
26-06-2019
KUJU GM(K)/SO (E&M)/Pundi/T.N/19-20/136 Complete repairing & reconditioning of 1000 GPM Pump,111 A,PLURO 3CHR,QM-250, 1486 RPM,150 Meter hea 26- 06-2019 04- 07-2019
17: 00   
05- 07-2019
11: 00   
26-06-2019
KUJU GM(K)/SO (E&M)/Pundi/T.N/19-20/137 Complete repairing of body, structure, tyre mudguard, window glass, Seat, Door lock, running repairi 26- 06-2019 04- 07-2019
17: 00   
05- 07-2019
11: 00   
26-06-2019
KUJU GM(K)/SO (E&M)/Karma/T.N/19-20/138 Complete repairing & reconditioning of UP 150-45 Pump,1500 RPM, 80 Meter head of Kirlosker make Pu 26- 06-2019 04- 07-2019
17: 00   
05- 07-2019
11: 00   
26-06-2019
KUJU GM(K)/SO (E&M)/Karma/T.N/19-20/139 Making of chemical earthing system of weighbridge at Karma Project of Kuju Area 26- 06-2019 04- 07-2019
17: 00   
05- 07-2019
11: 00   
26-06-2019
BARKA SAYAL SO(E&M)/B-S/tender/Repair- DSM Pump/Birsa/19-20/1604 Repair- DSM Pump 28- 06-2019 02- 07-2019
17: 00   
04- 07-2019
11: 15   
26-06-2019
BARKA SAYAL SO(E&M)/B-S/tender/Erection- OH line /BHK/19-20/1605 Erection-OH line 28- 06-2019 02- 07-2019
17: 00   
04- 07-2019
11: 00   
26-06-2019
BARKA SAYAL SO(E&M)/B-S/Tender/Repair- 550KVA Trfr /BHK/19-20/1603 Repair-550 KVA Trfr 28- 06-2019 02- 07-2019
17: 00   
04- 07-2019
11: 30   
26-06-2019
KUJU GM(K)/SO (E&M)/Pindra/T.N/19-20/151 Erection of 220 Volt O.H line for street light control of Pindra Colliery under Kuju Are 26- 06-2019 04- 07-2019
17: 00   
05- 07-2019
11: 00   
26-06-2019
KATHARA P.O. (KTW) / Sr. Manager (CP) /Tender /19-20/ 53 Providing and fixing of 50 watt x 220 volt LED street light fitting of secondary primary crusher in Raw Coal Section at KTW

Repairing /overhauling of magnetic separator drum assembly of unit no. 333 & 334 in Hy. Cy. Section at KTW

Repairing and overhauling of 5K pump for return water in Hy. Cy. Section at KTW

Repairing & overhauling of Polish vibrator for disliming screen unit no. 355 & 356 in Hy, Cy, Section at KTW

Urgent procurement of the gland bush brass and loop bush brass for delta pump at River side under at KTW

Urgent procurement of the fire fighting hose of KTW

Repairing / rewinding of different type and capacity of induction motor, volt 415, 3 phase, 50Hz, -i) 55KW, RPM 1470, Sl No. R/S 04, Make-Indian-ii) 20KW, RPM-730, Sl. No. 8603712, make- Russian at KTW

Repairing / rewinding of 160 KVA, 11KV/440Volt transformer Amp-8.39 / Amp-209.9, Sl. No- 149/1 of KTW

27- 06-2019 02- 07-2019
15: 00   
03- 07-2019
11: 30   
26-06-2019
KATHARA MGR/ GVP Ph-II/ T/ Notice /19-20/01 Board (Iron)-1ftX2.5 ft b. Pole (iron)- 3 inch diaX12 ft length c. Pole (Iron)- 2 Inch diaX10ft leng 26- 06-2019 29- 06-2019
16: 00   
02- 07-2019
11: 30   
25-06-2019
KATHARA SGW/PO/KTA/E&M/Tender/19-20/04 Providing and fixing of DTH 630 Amps switch for CCB and main plant installed at LT room of Sawang Washery

Repairing of follower plate and casing suction side for metso 100K, 47 & 48 pump in Main Washing Plant at Sawang Washery

Repairing of C/Coal BC conveyor counter weight structure and take up drum of main Washing plant at Sawang Washery

Fabrication/Erection of steel structure work for 51 BC head drum platform in Main Washing Plant at Sawang Washery

Fabrication/Erection of steel structure work Bye Pass BC conveyor structure work in Main Washing Plant at Sawang Washery

Fabrication/Erection of steel structure work 40 BC Discharge chute and structure in Main Washing Plant at Sawang Washery

Fabrication/Erection of steel structural work 42 screen platform structure work in main washing plant at Sawang Washery

Fabrication/Erection of steel structural work for ROM BC discharge chute, tray, hopper etc and “B” shuttle conveyor belt change in Raw Coal Section at Sawang Washery

26- 06-2019 03- 07-2019
17: 00   
05- 07-2019
11: 00   
25-06-2019
BOKARO & KARGALI SO(EnM)/19-20/04 Hiring of LMCV for BnK Area 17- 06-2019 27- 06-2019
16: 00   
29- 06-2019
16: 30   
25-06-2019
KATHARA P.O. (KTW) / Sr. Manager (CP) /Tender /19-20/ 51 Fabrication and erection of screen and its shive bend etc. of unit no. 309 & 310 of 17mtr level in Hy. Cy. Section at KTW

Fabrication and erection of heavy media launder in Hy. Cy. Section at KTW

Fabrication and erection of (02 Nos) delivery pipe collector flow I and II in Sec-II coal tank of Hy. Cy. Section at KTW

Fabrication and erection of middling belt conveyor, head drum, gear box frame, platform and structure etc of unit no. 425 in Hydro Cyclone Section of KTW

Fabrication and erection of upper structure of heavy media in Hy. Cy. Section at KTW

Cutting dismantling & new assembling of cyclone body and structure making of unit no. 309 in Sec-II at Hy. Cy. Section at KTW.

Repairing, fabrication and erection of feed pipe 9mtr level unit no. 310 of Hy. Cy. Section at KTW

26- 06-2019 01- 07-2019
15: 00   
02- 07-2019
11: 30   
25-06-2019
NORTH KARANPURA GM(NK)/E&M/Tender Notice/19-20/28 Dismantling and erection of 3.3 KV OH Lines for power feeding to 1000 GPM pump at Sump – 01 under Ro 01- 07-2019 06- 07-2019
12: 00   
10- 07-2019
16: 30   
24-06-2019
NORTH KARANPURA GM(NK)/E&M/Tender Notice/19-20/27 Repairing / re-commissioning electrical light fitting / fan and wiring of Officers club, Rohini in r 01- 07-2019 06- 07-2019
12: 00   
10- 07-2019
16: 30   
24-06-2019
NORTH KARANPURA GM(NK)/E&M/Tender Notice/19-20/26 Preparation of 03 Nos. of Chemical earth pit for Rail weighbridge for connecting lightening arrestor and rail weighbridge equipments under Dakra Project, NK Area.

Cleaning of Grass & Vegetation and Jungle / Bush cutting under 11 KV / 3.3 KV OH Line from KDH Sub-station to Rohini Workshop Chowk (4.00 KM) in respect of Rohini Project, NK Area.

01- 07-2019 06- 07-2019
12: 00   
10- 07-2019
16: 30   
24-06-2019
NORTH KARANPURA GM(NK)/E&M/Tender Notice/19-20/25 Supply and installation of signaling arrangement in main haulage, 6MD drift, 46L/6MD haulage upto 77 01- 07-2019 06- 07-2019
12: 00   
10- 07-2019
16: 30   
24-06-2019
GIRIDIH SO(EnM)/19-20/07 Hiring of LMCV(Scorpio or its Equivalent) on temporary basis 24- 06-2019 27- 06-2019
16: 00   
28- 06-2019
16: 30   
24-06-2019
KATHARA P.O./KTW/ Asst. Manager (CP)/Tender/19-20/45 Fabrication and erection of railway weigh bridge and joist, angle and plate etc. of clean coal side in RLB Section of Kathara Washery

Fabrication and erection of vibrating screen platform both sides in RLB Section of Kathara Washery

Fabrication and erection of assembling, mounting and spring etc. of vibrating screen in RLB Section of Kathara Washery.

Fabrication and erection of sieve bend and repairing of its frame, arms, angle and platform etc. of clean coal screen in Hydro Cyclone Section of Kathara Washery

Fabrication and erection of reject bunker feeder and its angle, channels, plate hanger and bearing of Unit No. 192 in Raw Coal Section of Kathara Washery

Fabrication and erection of take up drum structure of Unit No. 201 in Raw Coal Section of Kathara Washery

Fabrication, erection and new assembly of tail drum & head drum and its bearing, housing etc. of Unit No. 267 at HMS Section of Kathara Washery

24- 06-2019 29- 06-2019
13: 00   
01- 07-2019
11: 30   
23-06-2019
KATHARA P.O. (KTW) / Sr. Manager (CP) /Tender /19-20/ 49 Construction of pillars in all heaps for base line & Co- ordinate pillars for measurement of coal heaps of KTW

Fabrication and erection of supporting structure of installation of head drum of unit no. 269 middling coal side belt conveyor in Hy. Cy. Section at KTW

Fabrication & erection of gear box structure in Unit no. 191 of Raw Coal Section at KTW

Fabrication & erection of receiving chute of 60 picking belt conveyor in Raw Coal Section at KTW

Cutting pits / Trenches in bottom layer of Raw Coal at Raw coal stock heap no. 11 at firry zone to inhale rain water for arrest the fire at KTW

Repairing and overhauling of magnetic separator shaft of unit no. 333 & 338 in Hy. Cy. Section at KTW

Providing and fixing of 150 watt x 220 volt LED flood light fitting assembly of main plant at KTW

25- 06-2019 01- 07-2019
15: 00   
02- 07-2019
11: 30   
22-06-2019
BARKA SAYAL PE(X)UriTender NoticeR&M19-2012 repairing of damaged RHS coupling and Intermediate shaft of Shovel sl.no. 562 19- 06-2019 24- 06-2019
16: 00   
25- 06-2019
16: 00   
22-06-2019
BARKA SAYAL PE(X)UriTender NoticeR&M19-2011 Repairing of hand railing, radiator tank, diesel tank & damaged hose of Dumper sl.no 3658 19- 06-2019 24- 06-2019
16: 00   
25- 06-2019
16: 00   
22-06-2019
BARKA SAYAL PE(X)UriTender NoticeR&M19-2010 Repairing of 02 nos. steering cyl. of BH 60M Dumper sl.no. 6003 19- 06-2019 24- 06-2019
16: 00   
25- 06-2019
16: 00   
22-06-2019
BARKA SAYAL PE(X)UriTender NoticeR&M19-20\09 Repairing/replacement of safety glasses of operator cabin of CK300 Shovel sl.no. 160 19- 06-2019 24- 06-2019
16: 00   
25- 06-2019
16: 00   
22-06-2019
KATHARA PE(X)/ GVP Ph-II/ T/ Notice /19-20/97 Procurement of spares for use in HEMM of open cast mines of GVP Ph-II OCP. 22- 06-2019 25- 06-2019
13: 00   
27- 06-2019
13: 30   
22-06-2019
KATHARA P.O./KTW/Sr.Manager(CP)/Tender/19-20/47 Repairing, changing and overhauling of gear box sprocket and drum side sprocket of Unit No. 248 belt conveyor in HMS Section of Kathara Washery

Repairing and overhauling of 224 magnetic separator drum assembly of Section-II in HMS Section of Kathara Washery

Repairing and overhauling of Sec-I side Telpher after replacement of gear wheel and idler wheel in HMS Section of Kathara Washery

Repairing and overhauling of Gear Box PM 650 of 139 belt conveyor in Raw Coal Section of Kathara Washery

Repairing of head drum size 1400 x 1000 x 10mm of 180 belt conveyor in Raw Coal Section of Kathara Washery

Repairing of head snub drum size 1400 x 800 x 10mm of 202 belt conveyor in Raw Coal Section of Kathara Washery

Repairing / rewinding of different type and capacity of induction motor, Volt-415, 3Phase, 50Hz i) 15KW, RPM-975, SI No. NADL-56A ii) 14KW, RPM-1460 SI No. 44543 iii) 11KW, 975 RPM, Sl No. 85854 iv) 11KW, 975RPM, Sl No. 91175 v) 20KW, 930 RPM, Sl No. 982 at Kathara Washery

Repairing of head drum size 1400 x 800 x 10mm of 952 mini belt conveyor in RLB Section of Kathara Washery

Repairing of tension snub drum no. 1 (left side) size 1600 x 400 x 10mm of 950 belt conveyor in RLB Section of Kathara Washery

24- 06-2019 29- 06-2019
13: 00   
01- 07-2019
11: 30   
21-06-2019
KATHARA PE(X)/ GVP Ph-II/ T/ Notice /19-20/95 Procurement of spares for use in HEMM of open cast mines of GVP Ph-II OCP. 22- 06-2019 24- 06-2019
13: 00   
26- 06-2019
13: 30   
21-06-2019
KATHARA PE(Excv)/GVP Ph-II/19-20/92 Repairing of damaged insulation cabinet of L&T 300CK, Exc-2726 shovel of GVP Ph-II KTA.

Repairing of two nos. swing motor pinion of L&T 300CK, Exc-2768 shovel of GVP Ph-II KTA

Repairing of bucket latch bar box and latch bar of EKG5A Shovel Exc-2593 of GVP Ph-II Kathara area

Repairing of body and pivot installation assembly of BH60M dumper D-60001 of GVP Ph-II

Repairing of swing gear circle by gouging, welding & plate straightening with cabin denting of L&T 300CK Exc-2768 shovel of GVP PH-II

22- 06-2019 25- 06-2019
16: 30   
27- 06-2019
13: 30   
21-06-2019
KATHARA P.O. (KTW) / Sr. Manager (CP) /Tender /19-20/ 43 Replacement of liner plate of under chute of unit no. 250 screen in HMS at KTW

Replacement of top deck of unit no. 204 screen in HMS at KTW

Fabrication and erection Spray pipe new making and fitting near crusher of RCB Section at KTW.

Fabrication and erection of new pipe line from vertical pump to heavy media bath at 4.8mtr level of HMS at KTW

Fabrication and erection of bottom collector of coal tank in Sec-I of Hy. Cy. Section at KTW

Fabrication and erection / repairing of perforated plate of dilute media tank in sec-I of Hy. Cy. Section at KTW

Fabrication and erection of upper structure of coal tank in Sec-I of Hy. Cy. Section at KTW

22- 06-2019 28- 06-2019
15: 00   
29- 06-2019
11: 30   
21-06-2019
KATHARA GM(KTA)/SO(E&M)(W)/Tender/19-20/86 Testing, examination & certification of lifting tools & tackles, pressure vessels & EOT crane 29- 06-2019 05- 07-2019
17: 00   
10- 07-2019
16: 00   
21-06-2019
KATHARA GM(KTA)/SO(WS)/Tender/19-20/85 Repairing & Replacement of Eye Bolts & two nut (stud type) of single roller crusher 29- 06-2019 05- 07-2019
17: 00   
10- 07-2019
16: 00   
21-06-2019
KATHARA P.O. (KTW) / Asst. Manager (E&M) /Tender /19-20/ 41 Repairing of gear box GS-14 of B/C stand by and repairing of motorized gear box of thickener no-III of Fine Coal section at KTW

Repairing and overhauling of (8 gay pump) centrifugal pump of unit no. 651 and 361-T vertical pump of Sec-II in Fine Coal section at KTW

Repairing & overhauling of Rake lifting device gear assembly of redial thickener no-II of Fine coal Section of KTW

Repairing of head and tail drum for conveyor belt no. 493 and standby of fine coal Section of KTW

Repairing of bearing block of head and tail drum of 492 B/C in fine coal Section of KTW

Complete repairing / new making of motors dala both sides (DE & NDE) of i) 14 KW vertical motor ( 04 nos) ii) 705 KW induction motor (04 nos) in the fine Coal section at KTW

Repairing of i) polish vibrating screen of unit no. 467 ii) Audco valve 02 nos. size 300mm dia for delivery line in the fine Coal section at KTW

22- 06-2019 27- 06-2019
15: 00   
28- 06-2019
11: 30   
21-06-2019


   Company    Business    Info Desk    Online Services    Contact
   History    Performance Highlights    Rules & Manuals    Complaint Desk    Imp. Phone/E-mails
   Company Profile    Means of Business    Notices    Online Recruitment    Registered Office
   FDs Profile    Bill Payment Information    Forms & Formats    Online Pride Form
   Area of Operation    Status of EMDs/SDs    Circulars/Documents    Annual Property Return
   Management    HEMM Status    Delegation of Power
   RTI Act    Pricing    Tenders     
   Recognition    Rate Contract    Important Links     
   Mega Projects    Supply Order    Grievance Redressal     
Developed by System Dept. CCL Ranchi